Monday, 12 December 2011

Shooting Schedule

We are now at the point in our project where we have conducted our research and planned our music video. Therefore we aim to begin filming very soon and so we have created a shooting schedule that will keep us organised and up-to-date with our filming. However we are aware that this is only a rough guideline as we must take into consideration the weather conditions for our outside footage. Also we have approximately 6 weeks until the end of this term and we are aware that our filming must be completed by this time so that we can spend the majority of our time on editing our footage in post-production. 

Scene locations: 3
                           - Black studio
                           - New Walke street
                           - Narrative; pub, kitchen, sofa.


Week beginning 12th November 
Finish planning and prepare for filming,ensuring everything is ready for the first location. 


Week beginning 19th december

- Tuesday 20th - New Walke Street (morning)

- Wednesday 21st - Black Screen Studio (3pm onwards)

- Friday 23rd - Pub (afternoon)
                  - Beth's house - kitchen and living room (afternoon onwards)


Checklist:

New Walke:
- 2 Canon digital cameras
- Steering wheel camera holder
- Tripod
- Casual/pretty costume

Black Screen Studio:
- 2 Canon digital cameras
- Steering wheel camera holder
- 2 tripods
- torches
- Microphone
- Microphone stand

Narration locations:
Pub:
- 2 Canon cameras
- Steering wheel
- Tripod

No comments:

Post a Comment